T-2 with Officers' Row in the background 2003
[HH Progress] | Projects Intro | Heritage Hall | Carriage Houses | T-1 Proposal | Discussion | Exteriors | Tile Roofs |
[1][2][3][4][5][6][7]

Heritage Hall Progress Photos

HVAC System Installation

The old furnace in T-2
Installation of a new furnace
A new efficient furnace

Installation of a complete HVAC system at Heritage Hall required wiring and insulation throughout T-2 to replace the antiquated system [left photo].

New insulated heating ducts installed in the rafters
Energy efficient climate control installed throughout T-2
Overhead fans in Heritage Hall will help control the new heating and air conditioning

New, insulated heating ducts were installed along with efficient climate control in the rafters of T-2. Dimmer switches operate lights and fans for versatility and energy and A/C efficiency.

[1][2][3][4][5][6][7]